Challenge
This 7,600 square foot project converted what was originally a restaurant into a 17-exam room urgent care facility for Benefis Health System in Great Falls. The program included a digital radiology suite, lab, procedure rooms and an occupational health center. Thanks to our extensive portfolio of health care projects, we had a general understanding of the operations, movements, and functions of the medical equipment specific to each room. This played a significant role during the Schematic Design Phase by strategizing and creating an efficient layout of the program with the owner.
Cost: $1,287,687
Size: 7,600 SF
Unique: Expanded a two-exam-room facility into a 17-exam-room facility by converting the adjacent restaurant into an immediate care facility.
CLIENT
Benefis Health System
What we did
Architectural Design, Interior Design, Construction Administration
Staff Assigned
Ryan Smith
Scott Keller
Sydney Bogden